angleironcloseup.jpg
After drilling into the concrete, bolts were installed to connect the angle iron.
brickoneapril8.jpg
The first 2 bricks - only 698 to go!!
bricklayingapril8.jpg
Down into the pond to smooth out the mortar as he installed the copies.  The water under the scaffolding was still about 3 feet deep at this time.
bricklayingapril9.jpg
Slow but sure - leveling each set of bricks as he moved along.
bricksapril9.jpg
Bricks after a muriatic acid bath - note the staggered seam line.
bricks3april9.jpg
genecornerweb.jpg
Gene rented a mason saw and we customized the corners

Enter content here

Enter content here

Red brick coping to top the pond
cuttingangleiron.jpg
Gene cut angle iron to fit around the pond.  This is supporting the brick coping installed on top of the pond.
angleiron2march.jpg
Here's a photo of the angle iron installed - you can see a sample of the brick that has become the coping on top of the pond.
bricksapril8.jpg
brickcleaningapril9.jpg
Phyllis cleaned bricks after the mortar has set up - and later finished with muriatic acid to get all the residue off.
bricks2april9.jpg
cornerconcreteweb.jpg
The corners are nearly finished.  We'll be replacing the wood block with tiles from Pattigrafix!!!